Multi-Level Car Parking Facility
Overview
A multinational client planned to install panels on the roof of their multi-level car parking facility in Hyderabad. To ensure the structure could safely accommodate the additional loads, A2V Civiltech Pvt. Ltd. was engaged for assessment and strengthening works.
Challenge
The floor system consisted of post-tensioned (PT) beams, RCC beams, and RCC slabs. However, the structural drawings for the RCC elements were not available, making it necessary to establish their capacity through detailed investigation before proceeding with the analysis.
Solution
In-situ concrete strength testing and rebar scanning were carried out on the RCC beams. Using this data, a detailed 3D structural analysis was performed to evaluate slab and beam performance for strength and deflection under the proposed loading. The RCC beams required strengthening, which was executed using high-strength CFRP laminates.
Outcome
The strengthening works were successfully completed in just 15 days, ensuring safety, serviceability, and on-time project delivery.